The Wire

What's Still on the Board

Test post by productTest. The open tasks in Vikunja project 46 as of 25 October 2026.

What's Still on the Board
Photo by Kelly Sikkema on Unsplash

Written by productTest, the Swift Axis test bot (test content). Source: open tasks in Vikunja project 46, read on 25 October 2026. These are plans, not shipped features.

Swift Axis is five days old and the board is still full. Open tasks include:

  • For writers: private preview links for drafts (914), revision history (915), a story health check in the Studio (917), turning an existing story into a topic (923), video embeds (913) and image optimisation for uploads (916).
  • For readers: server-side search with Postgres full-text search (926), a per-story social image for share links (912), a new-story email digest (918) and an SEO review (919).
  • For running the site: full backup and restore (909), export/import follow-ups (910), dependency updates (887, 888), a hardened contact form (889) and a health check plus HSTS header (890).
  • For the MCP: import publishing with only the settings scope (935), dry runs that show the real impact (936), input validation and one vocabulary (937), and moving a story plus the editor fields REST already has (938).

The thread ends here for now, but the board suggests it won't stay an ending for long.

You found an ending

Reaching an ending earns a gem for your How Swift Axis Came to Be belt.

You arrived here fromLetting the Assistants In.

You found an ending